For more than a decade, CSA Group has either been an engineering subconsultant or a prime contractor for engineering services provided to the Philadelphia International Airport on IDIQ contracts. CSA Group was the engineering design service provider for an A/E IDIQ contract (as a sub to Tran Systems), a roofing replacement contract (sub to Converse Winkler Architects) and a Security Contract (sub to PSE).
Assignments with engineering design included:
- Roof replacement for Terminal B & Hammerhead B.
- Roof replacement for Terminal C Concourse, Terminal C Hammerhead and Terminal D Concourse.
- Upgrades to entrance vestibules at Terminals A-West, B, C, D and E.
- Demolition of buildings on a 5-acre site adjacent to the airfield.
- Installation of bollards at the arrival level at Terminals A-West, B, C, D and E.