Tag mk-surface

TBTA Construction Management & Inspection Services for Project BB-28S, Sandy Restoration, and Projects BB-28, PHII/BB-54. Rehabilitation of the Tunnel and Brooklyn Plaza at the Hugh L. Carey Tunnel

This 4-year construction project for the rehabilitation of the tunnel and Brooklyn Plaza at the Hugh L. Carey (formerly Brooklyn Battery) Tunnel was partially funded through a FEMA grant for Sandy-related repairs to prevent damage from future flood events. The…

TAMIAMI Trail Modifications

This FDOT District 6 Tamiami Trail Modifications project constructed a 1 mile, two-lane bridge and reinforcement of 9.7 miles of the road embankment (road approaches to the bridge) on Tamiami Trail, due west of the City of Miami in South…

PR-66 Highway Phase I & II

PR-66 was the latest addition to the Puerto Rico Strategic Roadway Network that connects expressway PR-53 and Expressway PR-26 to create a non-stop trip from San Juan to the eastern part of the island.  CSA worked for the Puerto Rico…

Port of Miami Tunnel

The idea of a tunnel connecting the Port of Miami to Watson Island was first conceived in the 1980s, to reduce traffic congestion in downtown Miami.  Prior to the tunnel’s opening, the only route for Port of Miami traffic was…

Monroe County Roadway Repairs

Following the damages caused by Hurricane Irma in 2017 affecting roads, infrastructures and environmental impacts, Monroe County required immediate engineering design and permitting services for roadway repairs along the Florida Keys. CSA provided engineering design services for roadway shoulder reconstruction,…